Twin wonders on piers

Courtney Tenz

Challenge

The record-breaking Brisbane Gateway Bridge built in 1986 needed an expansion due to increased traffic. The aim was to reach a 300-years life span with only a little maintenance.

Solution

The architectural challenge was resolved by using Outokumpu stainless steel bars in two submerged piers. In the long-term choosing stainless steel pays off as maintenance cost stay low during the lifecycle of the bridge.

Delivery

Outokumpu stainless steel rebar

The Gateway Bridge in Queensland, Australia, is really one of those architectural marvels you have to see to believe. The unique structure of the bridge crossing the Brisbane River was the first of its kind when built in 1986, with a record-breaking main span of over 260 meters stretching between two main piers.

Reaching a height the equivalent of a 20-story building, the four-lane bridge had to be tall enough to allow boats to pass beneath yet low enough to accommodate the flight patterns of the nearby airport. After designers came up with the four-lane solution that connects the eastern suburbs of Brisbane to the city, growth in the suburbs had created an increase in traffic on the bridge.

So in 2005, an expansion and duplication was announced. The already-standing four-lane motorway was increased to six lanes; just a few meters away, a second bridge duplicating the look of the first began to take shape.

 

Ambition below the surface

Creating a 1,627 meter bridge with fully submerged foundations proved quite the architectural challenge. What made it even more challenging, was the government's request that the bridge maintain a 300-years service life – something that had never been tested before. That's where stainless steel rebar came into play.

To limit the possibility of corrosion and therefore reduce the need for renovations, the bridge includes stainless steel on the two piers that are submerged. Although the price of stainless steel increased the costs upfront, in the end, just 130 of the 7,800 tonnes of steel used in the Second Gateway Bridge were stainless steel, which kept costs low.

 

Securing future crossings

The design-life target is a testament to the size and importance of the bridge; it also showed the recognition that although initial costs may be higher, in the long-term, the savings on repairs and extended time the bridge is in use pay off those costs.

When construction finished in 2010, the results were experienced by everyone who used the bridge, with some commuters noting they spent between 10 to 25 minutes less time in traffic. With the stainless steel reinforced piers, those smoother commutes will continue for centuries to come.

Recommended products and insight

Automotive and transportation

In transportation, today’s solutions must be dynamic enough to carry us to the future. Safe, strong, economical, durable and sustainable: Stainless steel delivers a new dimension of unmatched performance.

Supra

The Supra range contains stainless steel products designed for highly corrosive environments. Outokumpu Supra range stainless steels have a good resistance to uniform corrosion in many organic and inorganic chemicals. The addition of molybdenum enhances the alloy’s corrosion resistance in many acidic environments.

Eskilstuna, Sweden

Sweden’s long steelmaking tradition is showcased in the unique expertise found at the Eskilstuna Coil Service Center. Through outstanding quality and short lead times, the service center shows its commitment to the customer.

Recommended reading

Case Södertälje bridge

Designed to last

Case Sheikh Jaber Al-Ahmad Al-Sabah causeway

A span of uncommon strength

Case Husarviken bridge

Futuristic functionality

Case Rabbit Hill Road Bridge

Gateway to the North

Case Helix Bridge

Embodying essence of life

Case Stockholm railway bridge

Upgrading bridge construction

Case pedestrian bridge

Spanning time and distance